Day 7 was spent leveling and securing so it looked the same. Day 8 was more securing and putting the first level of bar top on.
Day 6
I knew leveling, squaring, and permanently securing the base was going to be a tough job. I spent about 2.5 hours on it last night and realized just how out of shape this 43 year old body is. I’m not used to crawling around on the floor, in and out of braces, and contorting my body like that. Another hour or so on it tonight and that part will be complete. Then on to the second level with more plywood cutting.
Day 5
Day 4
Lumber Question
Why are they called 2 x 4’s when they measure 2 x 3.5?
Day 3
Heading on Up!
Future Location of Berky’s Bar
Â