TJ’s working on the bar again so here are some pictures. She’s added the laminate to the sides and staining and varnishing the trim.
Category: Bar
Bar Update
The laminate has been cut and attached to the work top. Â Next steps are to complete the trim work and attach the first level of the bar top.
Many, Many Days Later
Days 9 & 10
Time for backsplash and electrical work.
Day 8
Day 6
I knew leveling, squaring, and permanently securing the base was going to be a tough job. I spent about 2.5 hours on it last night and realized just how out of shape this 43 year old body is. I’m not used to crawling around on the floor, in and out of braces, and contorting my body like that. Another hour or so on it tonight and that part will be complete. Then on to the second level with more plywood cutting.